Lough Mardal Lodge, Lough Mardal Lodge Glamping Glamping, Glamping Donegal, Glamping Ireland, Glamping Wild Atlantic Way, Glamping North West, Glamping West Coast of Ireland, Romantic Glamping, Eco Glamping, Luxury Glamping, Luxury Camping, Yurt Glamping, Unique Accommodation Donegal, Alternative Accommodation Donegal, Self-Catering Accommodation Donegal, Romantic Getaway Donegal, Winter Getaway Donegal, Autumn Getaway Donegal, Romantic Break Donegal, Winter Break Donegal, Autumn Break Donegal, Eco Accommodation Donegal, Unique Accommodation North West, Alternative Accommodation North West, Self-Catering Accommodation North West, Romantic Getaway North West, Winter Getaway North West, Autumn Getaway North West, Romantic Break North West, Winter Break North West, Autumn Break North West, Eco Accommodation North West

Building The Lodge

The Lodge is the large shared amenity building for our glamping guests which was completed in May 2019. This eco construction began in October 2017, not the ideal time of year to start a building project on the north west coast of Ireland! We tried to make it as eco as possible so used locally sourced roundwood timber, strawbales and lime as the main construction materials. There is also a living grass roof made from the earth excavated from the site.

The building was designed by Marcus and Cork artist and builder Christy Collard. Renowned for his beautiful craftmanship Christy has been pushing the boundaries of round-pole construction and reciprocal designs for years, his creations are as much works of art as they are functional spaces.

A special thanks to Strawbuild.org who drew up the detailed design drawings, to Hassen Mzali who got us going with the strawbuilding and Bee Rowan for all the advice and support.

We have since been included in a European database of strawbale buildings at  www.strawbuilding.eu 

Construction Photo Gallery

'Reciprocal Room' is almost complete

The 'Reciprocal Room' floor is finished...and shiny!

Fireplace

Proud fireplace builders.

Fireplace

Work on the huge fireplace begins with the help and guidance of stonemasons Andy Peters and Pete Gibson.

Taking a break

Taking a break

Eco Lodge

Showers near completion

Showers near completion

Floor goes down

Floor goes down in kitchen

Lough Mardal Glamping Ireland

Sky-light being installed

Lough Mardal Glamping Ireland

3.5m diameter dodecagon sky-light installed

Lough Mardal Glamping Ireland

Cob-filled stud walls

Lough Mardal Glamping Ireland

Cob wall taking shape

Lough Mardal Glamping Ireland

Ta-daah! Our cob glass bottle art design in the cob wall is complete. Thank you Sophie for doing such a wonderful job!

Lough Mardal Glamping Ireland

Lough Mardal Glamping Ireland

Trying out some art with recycled wine bottles

Lough Mardal Glamping Donegal

Clay plastering the internal walls

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Cob building internal walls begins

Lough Mardal Lodge Glamping Donegal

We now have a grass roof!

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Ireland

Protective wrap comes down

Lough Mardal Lodge Glamping Ireland

Lime-rendering complete. Coat after coat has been applied by hand, initially massaged into the straw and then layers added to create a uniform surface. The final coat is being applied now after 6 weeks of hard work and about 20 tonnes of lime and sand!

Lime Rendering

Lime rendering begins

Lough Mardal Lodge Glamping Donegal

First walls

Glamping Ireland

Windows in!

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Lough Mardal Lodge Glamping Donegal

Strawbale Inspector

Lough Mardal Lodge Glamping Donegal

Earth being spread on roof for grass roof

Lough Mardal Lodge Glamping Donegal

The building is 'wrapped' to ensure the strawbales (for the walls) keep dry inside

Lough Mardal Lodge Glamping Donegal

Roof membrane complete. Next stage earthing it up for the grass roof.

Lough Mardal Glamping Ireland

Roof membrane almost complete

Lough Mardal Glamping Ireland

Lough Mardal Glamping Ireland

Lough Mardal Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Front of building in snowy landscape!

Lough Mardal Lodge Glamping Ireland

The long beams and geometric shapes mesmerise

Lough Mardal Lodge Glamping Ireland

Forewoman watches on in blizzard

Lough Mardal Lodge Glamping Ireland

February 2018. Snow! Such a great time of the year to be building. ;-)

Lough Mardal Lodge Glamping Ireland

6th Feb - The reciprocal roof is complete!

Lough Mardal Lodge Glamping Ireland

Suddenly looking very big

Lough Mardal Lodge Glamping Ireland

4th Feb - The uprights for the outer ring go up

Lough Mardal Lodge Glamping Ireland

January 2018. Brrrr....

Lough Mardal Lodge Glamping Ireland

The inner ring is almost complete

Lough Mardal Lodge Glamping Ireland

Someone's taking it easy

Lough Mardal Lodge Glamping Ireland

Lough Mardal Lodge Glamping Ireland

Starting to take shape

Lough Mardal Lodge Glamping Ireland

Wood-henge!

Lough Mardal Lodge Glamping Ireland

Ever-growing piles of timber waiting to be stripped

Lough Mardal Lodge Glamping Ireland

First (of many) delivery of timber

Lough Mardal Lodge Glamping Ireland

11th Oct - Measuring out the site - with a very meticulous helper

Lough Mardal Lodge Glamping Ireland

Plans for the Lodge building

Construction Video Gallery

'Reciprocal Room' is almost complete